Category Archives: Gitchi Animki Bezhig

Gitchi Animki Bezhig Generating Station & Gitchi Animki Niizh Generating Station, Pic River

River:  Pic River
MNR Site No:  2BC2 and 2BC5
Project Name:  Gitchi Animki Bezhig and Gitchi Animki Niizh Generating Stations
Project Location:  Brother’s Township
Installed Capacity:  8.9 MW and 10 MW
Contract:  Feed-in-Tariff (FIT)
Proponent:  Pic Mobert Hydro Power Joint Venture
Status:  Under construction

More information here.


Sign a Petition

 

119 signatures

Speak Out Against Schedule 10 of Bill 66

Dear Sirs:

[signature]

This petition is now closed.

End date: Jan 20, 2019

Signatures collected: 119