Blog

Photo by Linda HeronPhoto Credit

Springbank Dam – One River Class EA – Preferred Alternative – Joint Submission

Springbank Dam, Thames River, London, ON

Our organizations recommend choosing Alternative 3 – the Full Removal of Springbank Dam and the naturalization of this section of the Thames River.   We submit that full dam removal and naturalization are the preferred solutions from an environmental perspective and would likely prove to be the most cost-effective over the long-term when Life-cycle costs and available provincial and federal funding are considered.


Download (PDF, 642KB)


Sign a Petition

 

114 signatures

Speak Out Against Schedule 10 of Bill 66

Dear Sirs:

[signature]

Please share this Petition with your friends.