Blog

Photo by Linda HeronPhoto Credit

Calabogie Generating Station Redevelopment – Madawaska River

Peaking operations, with the variable flow discharge and ramping patterns, the rate and frequency of water level changes, and the amount of time the station is at its maximum discharge level, can all have a significant impact on the degree of channel and bank erosion.