Blog

Photo by Linda HeronPhoto Credit

Category Archives: IAAC

IAAC: Great Bear Gold Project – Impact Statement Summary, Registry No. 85832

Great Bear Gold Project proposed site development.

ORA wishes to express its strong support and alignment with the submissions and recommendations of CELA on behalf of ANA/Grassy Narrows First Nation.

The Ontario Land Tribunal’s (OLT) engagement with this project reinforces these concerns and bears directly on the adequacy of the Crown consultation record. In 2025, the OLT granted ANA leave to appeal water-taking permits issued by the Province of Ontario to Kinross, finding that “no reasonable person” would have issued those permits in light of ANA’s documented mercury concerns. Kinross subsequently withdrew the permit application before the appeal could be heard. A new permit application was filed; on May 7, 2026, ANA filed a new application for leave to appeal the new permits, again on the grounds that sulphate discharge will drive mercury methylation in the Chukuni-English River system and produce elevated methylmercury concentrations in fish consumed by community members downstream.

Continue reading →


IAAC: Interim Regional Assessment for the Ring of Fire (Kawana ‘Bi’ Kag) – Reference No. 80468

The Ring of Fire sits within one of the largest intact peatland systems on Earth—a globally significant carbon store. Disturbance in this region is not local—it is permanent and globally consequential. Without enforceable thresholds, full infrastructure assessment, climate integration, and legally binding outcomes, this Regional Assessment risks documenting impacts while allowing irreversible damage to proceed.

Continue reading →


IAAC: Ontario Pumped Storage Hydropower Project – Project Reference: 89803

The Ontario Pumped Storage Project Initial Project Description – Plain Language Summary presents an incomplete, proponent-favourable characterization of a project with potentially severe, long-duration, and in some cases irreversible environmental consequences. The most critical gaps are the absence of a cumulative effects assessment, the inadequate treatment of fish entrainment and contaminant mobilization risks, the incomplete Species at Risk inventory, the absence of OCCIA 2023 considerations, and the lack of a genuine alternatives analysis.

Continue reading →