The notice asks municipalities why they are interested in the model and how they anticipate it “will improve” their services; what their fiscal circumstances are; what steps they are taking on infrastructure; how independent governance “would benefit” their systems; how their proposal “improve[s] efficiency and generate[s] economies of scale”; and whether they are “willing to merge your water and wastewater systems into a public utility with surrounding systems.”1
Not one question asks about risk. Not one asks about drinking water sources, receiving waters, watersheds, climate resilience, affordability for low-income households, First Nations, or the Crown’s duty to consult. Not one asks what happens if the model does not work. The questions are written so that only a municipality already inclined toward the model can answer them, and only in its favour.
The sixth question is the one that reveals the destination. Merging systems “with surrounding systems” is regional consolidation of municipal water and wastewater utilities. That is a far larger proposal than the notice describes, and it has not been consulted on.
Blog
Category Archives: Sewage
ERO-025-1387: Proposed administrative changes to Ontario’s Building Code related to the transfer of enforcement authority of on-site sewage systems and a proposed technical clarification
ORA submits that ERO 025-1387 is not a benign “service alignment” exercise. It is a governance change with real public health, environmental, and cumulative effects consequences. This proposal would transfer enforcement authority for Building Code Part 8 on-site sewage systems away from independent expert bodies—specifically, District Health Units and a Conservation Authority—and download it to small municipalities.
ERO-025-0872 – Streamlining environmental permissions for sewage works servicing on-farm worker housing
The magnitude of these systems alone makes this proposal indefensible. Both documents confirm that sewage works with a total capacity of up to 50,000 litres per day and individual systems with a capacity up to 25,000 litres per day may be installed and operated without an Environmental Compliance Approval.1,2 These volumes are not small or low-risk; they are equivalent to communal wastewater treatment systems serving dozens of households. Systems of this scale require careful plume modelling, nitrate-loading calculations, groundwater mounding analysis, assessment of down-gradient receptors, and long-term effluent criteria development—work that must be independently scrutinized to ensure protection of human health and drinking water sources. Allowing these systems to operate without MECP review creates an unacceptable risk of contaminant migration into shallow aquifers, private wells, and baseflow that sustains rivers and coldwater ecosystems.
ORA & VRS: Delegation to Sudbury Planning Committee – Exclude new hydroelectric in its Official Plan
Wabagishik Rapids, Vermilion River
Hydropower has been aggressively greenwashed for decades, despite well-documented, significant, and ongoing adverse environmental effects from its impoundments and peaking operations.
The negative environmental effects of hydro dams, reservoirs, and operating strategies can be extensive, affecting many kilometres upstream and downstream of the dam. That series of five cascading projects, six counting Vale’s Wabagishik Generating Station, would have been strung out for over 130 km of river, impacting from Capreol, all the way out to where it joins the Spanish River. It would have dramatically changed the Vermilion on many levels, stirring up contaminated sediment and impacting local residents who rely on the River for drinking water.
Proponents often claim hydro projects will last for 100 years, but there is a dark side to that.
Over the last three decades, a growing body of independent peer-reviewed research reports that hydroelectric reservoirs can be a significant and ongoing source of GHG emissions in boreal, temperate, and tropical regions. In fact, reservoir methane emissions can rival or exceed those coming from natural gas facilities over a 20-year horizon (e.g., DelSontro et al., 2018; Beaulieu et al, 2020; Scherer & Pfister, 2016).
ERO-019-7891-Proposing to Revoke the Municipal Class EA and make a New Regulation
Toronto Harbour Sewage Bypass – CBC
This proposal has the potential to pose major environmental and public safety risks to stakeholders, the public, and Indigenous communities. Consequently, the ORA is strongly opposed to all aspects of this proposed new MPAP regulation and highly recommends the complete withdrawal and permanent abandonment of the entire MPAP Regulation and revocation of the MCEA.
Delegation Request – Erin Water Resource Recovery Facility – Joint
Photo by Steven Noakes
The Coalition is very appreciative of your strong support in recommending to the Honourable David Piccini, Minister of Environment, Conservation Parks (MECP) and Mayor Allan Alls, Town of Erin, that our draft Monitoring and Adaptive Management Plan be integrated into the Environmental Compliance Approval (ECA). As you are likely aware, the ECA for the Erin Water Resource Recovery Facility was approved on 3 May 2022 by Aziz Ahmed, P.Eng., MECP Manager of Municipal Water & Wastewater Permissions, appointed for the purposes of Part II.1 of the Environmental Protection Act.
ERO 019-4219 – Moving to a project list approach under the EAA
West Credit River Brook Trout – Photo by Steve Nokams
When these unregulated projects come home to roost, and the environmental impacts begin to damage or destroy highly valued public interests, such as our lakes and rivers, endangered species, our drinking water, and the economy, the government will pay a very high price. Unfortunately, the damage that will result from these irresponsible and negligent actions will not easily be undone, and in many cases will not be resolved in our lifetimes.
If the government wants to incorporate “one-project, one review”, then it must be a robust EA process with fulsome public and Indigenous consultation, or it may find the process much longer than it might have intended.
Response to MECP Decision on Application for Investigation
Photo by Steve Noakes.
We were very disappointed in Ms. Paul’s decision to deny our Application for Investigation; however, we were also not surprised. This provincial government has systematically dismantled much of Ontario’s environmental policy and legislation with an ambitious goal of “cutting red tape”, and “modernizing”. They have successfully carried out their mission through specious explanations that mislead the public and deflect concern over important Environmental Registry postings and massive omnibus Bills. This method has allowed them to proceed with sweeping cuts to numerous pieces of important legislation without much public fuss – all during their declared COVID Emergency. The decision on our Application for Investigation is simply another example of bypassing key legislation to facilitate a Project that has strong community opposition.
ERO-019-3268 – Strengthening our Environmental Compliance Approach
West Credit River, Photo by Steve Noakes
The ORA offers strong support for polluters being held accountable; however, that isn’t what’s happening here. Rather than strengthening enforcement tools that hold polluters accountable, this government is systematically and persistently dismantling, weakening or bypassing all environmental policy and legislation that was designed to protect the environment and deter those industries, corporations or individuals who would pollute and/or destroy the environment.
These ERO postings consistently mislead the public, especially in the top several paragraphs and titles, which contain misleading introductions to the proposed policy the government is proposing. In fact, you can always count on these “modernization” policy changes to be a further attack on environmental policy and legislation. It is even more despicable that these attacks have largely been carried out during the government’s declared COVID Emergency, where no public consultation is required, and what consultation that does take place is meaningless when the main objective is to cut red tape and remove any roadblocks to development and pollution, in spite of the public’s strong recommendations to protect the environment.
Minister Wilkinson Decision on Designation Request – Letter to Coalition
After careful consideration of the information provided by the Town of Erin, federal authorities, provincial ministries, the local conservation authority, the concerns expressed in your letter, other known public concerns, and advice from the Impact Assessment Agency of Canada (the Agency), I decided that the Project does not warrant designation pursuant to Subsection 9(1) of the IAA.