ERO 026-0329: Technical Guide, River and Stream Systems: Flooding Hazard Limit, and Technical Bulletin, Special Flooding Hazard Conditions in River and Stream Systems

24 June, 2017 – An extreme rain event caused the dam to fail when all the stop logs could not be removed.

ORA has reviewed both draft documents. We are strongly opposed to this proposal and we ask the Ministry of Natural Resources (MNR) to withdraw it.1 The hydrology and hydraulics chapters of the Technical Guide are a real improvement on the 2002 edition and should be retained and completed; however, the Technical Bulletin should not proceed in its current form. It reverses a provincial policy that exists to keep people and communities out of harm’s way, it does so in a document that no one is required to follow, and it does so without a single word about the environment, about Indigenous communities, or about who pays when a dam or water retainment structure fails.

This is a public safety matter. Loss of life and loss of property are what is at stake, and this proposal goes against the public interest.

ORA has made it clear that we are strongly opposed to this proposal and that it should be withdrawn. In the event MNR moves forward regardless, the recommendations below are offered as a fail-safe to mitigate the Ministry’s mitigation efforts. None of them should be read as support for the proposal.

Continue reading →


ERO 026-0427, Fortifying Ontario’s Economy: A vision for protecting Ontario, strengthening economic sovereignty, and securing global leadership in critical minerals.

A Vermilion River Otter, By Al Oman

A strategy that halves review time, proposes permit-by-rule, ignores its own climate science, weakens species law, short-changes public and Indigenous consultation, commits to century-long methane-emitting reservoir infrastructure over its own innovative and green alternatives, and treats Indigenous consent as an equity transaction, is not protecting Ontario’s economy. It is mortgaging Ontario’s watersheds, its climate resilience, and its relationships with First Nations against a demand the public was never asked to approve. It does all of this to fast-track projects, while the courts are still being asked whether the very laws that enable it are constitutional.

Continue reading →


ERO-026-0414: Streamlining Requirements for Waste Disposal Site Service Area and Fill Rate Changes

ORA urges the Ministry to withdraw this proposal. ERO-026-0414 is not a red-tape reduction measure. It is the elimination of the only independent environmental assessment for a class of waste disposal decisions that can directly affect groundwater, contaminate rivers, damage aquatic ecosystems, and undermine the health and food security of rural and municipal communities, Indigenous peoples, and all communities living near waste-disposal sites. Posted as a companion to Bill 105’s simultaneous assault on the Comprehensive EA process (ERO-026-0415), it is part of a coordinated and accelerating dismantling of Ontario’s environmental protection framework, a withdrawal by the Province from its constitutional and moral obligation to hold Ontario’s natural environment in public trust for present and future generations.

Continue reading →


ERO-026-0312: Proposed Changes to Support Standardizing of Parkland Requirements Under the Planning Act (Bill 98)

The Ontario Provincial Climate Change Impact Assessment (OCCIA 2023) documents increasing precipitation intensity, hydrological volatility, and flood frequency across Ontario.4 The Auditor General of Ontario’s 2022 report on urban flood risk documented billions of dollars in flood-related municipal infrastructure losses and found that existing floodplain mapping substantially underestimates actual flood risk in many communities.5 Flooding events in spring 2024 and spring 2026 across the Sudbury, Ottawa, and Lake Erie watersheds caused widespread municipal infrastructure damage and emergency costs. Municipalities that accept floodplain-adjacent land as parkland will inherit maintenance liability and public safety responsibility for lands that are demonstrably at increasing flood risk.

ORA submits that floodplain-adjacent lands, including valley lands and riparian corridors that fall within but near the boundary of identified hazard areas, should be explicitly ineligible for developer-identified parkland credit, not merely eligible on an undefined condition.

Continue reading →


IESO: East Lake Superior Regional Electricity Planning-11 December 2025

Most critically, the options analysis remains disconnected from Ontario’s most authoritative climate risk evidence. The IESO relies on generalized “extreme weather methodology” references rather than the Ontario Climate Change Impact Assessment (OCCIA)[i], which provides region-specific projections for drought frequency, extreme precipitation, temperature volatility, and hydrological change — all of which directly affect transmission reliability and hydroelectric performance. This omission materially undermines confidence in both wire and non-wire option selection.

[i] Ontario Provincial Climate Change Impact Assessment, Technical Report, January 2023.  Online: https://www.ontario.ca/files/2023-11/mecp-ontario-provincial-climate-change-impact-assessment-en-2023-11-21.pdf

Continue reading →


IESO: Bulk Planning Update Webinar (Eastern Ontario Bulk Plan) – December 12, 2025

ORA submits that Eastern bulk planning must not function as a backdoor implementation tool for the Province’s post-election “Energy Superpower” agenda. Voters, and ultimately ratepayers, did not authorize a supply-expansion and export trajectory. The IESO must therefore clearly distinguish between reinforcements required to meet demonstrated Ontario reliability needs and those designed to enable speculative industrial growth or new generation development pathways—particularly high-impact hydropower expansion. Bulk planning must not be used to pre-build capacity and corridors for an export-oriented supply surplus.

ORA further submits that the Province’s “Energy Superpower” framing is economically reckless and directly contrary to ratepayer interests. Ontario households have already experienced a significant electricity price shock: the Ontario Energy Board increased Regulated Price Plan electricity prices effective November 1, 2025 (widely reported as a ~29% increase), while the Province simultaneously increased the Ontario Electricity Rebate from 13.1% to 23.5% in an apparent effort to buffer bill impacts. This is not a stable affordability moment to hard-wire major new system-expansion costs into Ontario’s electricity future.

Ratepayers are already experiencing significant affordability impacts, including sharp increases in total electricity bills since November 2025, even after provincial rebates. For example, a residential Hydro One customer’s Hydro bill from December 2025–January 2026 shows total charges of $642.33 for 4,177 kWh, including an Ontario Electricity Rebate of –$168.66 and “Total Ontario support” of $321.67 — confirming that rising system costs are increasingly being masked through subsidies rather than avoided through least-cost planning. This illustrates the structural affordability problem: costs are rising sharply, and rebates are being increased to mask the impact rather than reduce the underlying drivers.

Continue reading →


IESO – Long-Lead Time RFP – September 16, 2025

Riverine ecosystems and rapids like this would be lost. Photo by Mark Clement

Hydroelectric dams typically have a life expectancy of ~100 years, during which their reservoirs will continuously emit CO2 (carbon) and particularly CH4 (methane), even in temperate and boreal climates. In fact, Ontario Power Generation is in the process of rehabilitating several of its 66 hydroelectric facilities in Ontario, including the 117-year-old Kakabeka Falls Generating Station. Unfortunately, this means these facilities will continue to emit copious amounts of methane for another ~100 years.

Continue reading →


IESO – Long Lead-Time RFP – June 5, 2025

“Canada’s increasing struggle with hydropower is an ill omen representing a wider global problem. Climate change and droughts are threatening hydropower supplies everywhere, and as severe weather events become increasingly common due to climate change, the future of the world’s leading renewable energy source is vulnerable. The greatest problem is not just the severity of any drought but the persistence of drought conditions over an extended period of time. The Yale Climate Connection argues that the link between climate change and increasing drought conditions worldwide is demonstrable, and things are getting worse. Global hydropower generation dropped significantly in the first half of 2023, resulting in an overall increase in fossil-fuel power production to make up for the deficit.”

Continue reading →


ORA Feedback on IESO Long-Term 2 RFP – April 24, 2025

The Chute, First Falls, Ivanhoe River – Photo by Mark Clement

For over a century, hydropower has been greenwashed as a clean, renewable, and non-emitting energy source. In reality, hydro dams and their reservoirs are major drivers of climate change–emitting methane, carbon and nitrous oxide throughout their entire lifespan. Beyond greenhouse gases, their operations can reduce water quantity for long durations of time, degrade water quality, result in erosion, sedimentation, methylmercury contamination in fish, disrupt ecosystems, and threaten biodiversity. Far from being a clean and sustainable solution, hydropower poses serious environmental risks as long as the dam remains standing.

Continue reading →


Hydro Impacts 101: The Trade-offs

We’ve been sold the idea that hydropower is a clean, green, and non-emitting energy source.
But this is far from the truth!💔🌱

Check out this eye-opening infographic and the full report below to learn more about the hidden environmental and socio-economic costs of these projects! 🌊💰

  • Hydro impacts 101: the trade-offs

Hydro Impacts 101 – The Trade-offs