River:Â Pic River
MNR Site No:Â 2BC2 and 2BC5
Project Name:Â Gitchi Animki Bezhig and Gitchi Animki Niizh Generating Stations
Project Location:Â Brother’s Township
Installed Capacity:Â 8.9 MW and 10 MW
Contract:Â Feed-in-Tariff (FIT)
Proponent:Â Pic Mobert Hydro Power Joint Venture
Status:Â Under construction
More information here.