Chose Alternative 5
Excerpt from the Final Environmental Study Report:
In this alternative, the dam would be decommissioned through the removal of all available operational dam elements related to flow control including the stop logs and gains, as well as the low-level sluice gate bypass system. The decommissioning of the flow controls would be undertaken over an extended period of 2 to 3 years or more, to limit potential remobilization and offsite transport of accumulated sediments within the existing reservoir and to provide time for the sensitive flora and fauna of the area to acclimate to changing conditions. Continue reading