ORA’s concern is heightened by the growing influence of directives from the Minister of Energy and Mines over IESO preferences that are backed by data or studies. The April 16, 2026, Ministerial Directive instructed the IESO to procure new long lead-time hydroelectric generation, even as the Directive acknowledged that these resources are “deemed not well-suited to competing against resources with shorter development timelines and lifespans (e.g., wind, solar and inverter-based battery energy storage systems).” That instruction overrode the IESO’s own August 2025 Hybrid Resource Equivalency Assessment, which found that wind, solar, and battery energy storage systems (BESS) could serve 99.5 to 99.98 percent of load in the Peaky Need Scenario. When political direction can displace the IESO’s own expert analysis, on-the-record, Board-governed control of market parameters is not a formality. It is the safeguard that keeps ratepayer-facing decisions independent, accountable, and aligned with the public interest rather than a shifting political agenda.