ERO-025-0660 Enhancing Electricity Transmission Capacity in Northern Ontario The Greenstone Transmission Line

Lake Sturgeon trapped in hydroelectric overflow channel.

The hydropower industry in Ontario has consistently prioritized power generation and profit over ecological stewardship. Out of 224 hydroelectric facilities across the province, only two are equipped with operational fishways—an alarming indicator of systemic neglect for fish passage and aquatic ecosystem connectivity.

Recommendations:

  1. Do not fast-track or declare the GTL a ‘priority project’ until comprehensive, transparent, and science-based environmental and cumulative effects assessments are completed and publicly disclosed.
  2. Maintain full OEB oversight authority over project need and alternatives assessment.
  3. Ensure that consultation with Indigenous communities is resourced, Crown-led where required, and includes mechanisms for consent and alternative development pathways.
  4. Ensure that the January 2023 Climate Change Impact Assessment Report and its warnings and recommendations are fully integrated into mitigating all projects being considered in Ontario.
  5. Require the inclusion of climate resilience, biodiversity protection, and land-use minimization in the design and planning process.
  6. Expand support for decentralized, Indigenous-led renewable energy systems as an alternative to centralized transmission expansion.
  7. No new hydroelectric procurement in Ontario.

Reject the socio-economic overreach embedded in Ontario’s ‘Global Energy Superpower’ narrative. This aspirational framing prioritizes international prestige and resource exploitation over environmental responsibility, public interest, and community-scale resilience.