The magnitude of these systems alone makes this proposal indefensible. Both documents confirm that sewage works with a total capacity of up to 50,000 litres per day and individual systems with a capacity up to 25,000 litres per day may be installed and operated without an Environmental Compliance Approval.1,2 These volumes are not small or low-risk; they are equivalent to communal wastewater treatment systems serving dozens of households. Systems of this scale require careful plume modelling, nitrate-loading calculations, groundwater mounding analysis, assessment of down-gradient receptors, and long-term effluent criteria development—work that must be independently scrutinized to ensure protection of human health and drinking water sources. Allowing these systems to operate without MECP review creates an unacceptable risk of contaminant migration into shallow aquifers, private wells, and baseflow that sustains rivers and coldwater ecosystems.