Blog

Photo by Linda HeronPhoto Credit

Feedback on IESO Resource Adequacy and Long-Term 2 RFP Feedback on Engagement

Abitibi River – Twin Falls GS

The ORA is providing feedback on the 22 February 2024 Independent Electricity System Operator (IESO) webinar. ORA strongly objects to agricultural land being used for energy projects, as it is just another land-grab opportunity. Agricultural land is Ontario’s vitally important breadbasket, and it must be protected.

ORA also strongly objects to new hydroelectric being included as a “non-emitting” resource, eligible for the Long-Term 2 Request For Proposals (LT2-RFP). It was clearly stated in the engagement workshop and in the slide presentation that “the IESO has been asked by the Ministry of Energy to review the role of existing assets and new non-emitting electricity resources that can be in-service by 2029 including wind, solar, hydroelectric, storage and bioenergy”.

[pdf-embedder url=”https://www.ontarioriversalliance.ca/wp-content/uploads/2024/03/2024-03-07-ORA-to-IESO-LT2-RFP.pdf” title=”2024-03-07-ORA to IESO-LT2 RFP”]