Blog

Photo by Linda HeronPhoto Credit

Feedback on the IESO Resource Adequacy and Long-Term 2 RFP Engagement

The ORA is offering feedback on the 13 December 2023 Independent Electricity System Operator (IESO) webinar. ORA strongly objects to new hydroelectric being included as a “non-emitting” resource, eligible for the Long Term 2 (LT2) Request For Proposals (RFP). Participants were informed of an overall need for 5 TWH of energy emerging at the end of the decade and growing through the 2030s. The LT2 RFP has an anticipated installed capacity target of around 2,000 MW of non-emitting energy resources to be procured and operational by 2030.  ORA questions the IESO’s rationale for applying the non-emitting label to hydroelectric when there are numerous independent third-party peer-reviewed studies, as well as the Intergovernmental Panel on Climate Change (IPCC) reporting guidelines. This immense volume of studies indicate that hydropower reservoirs generate significant and ongoing greenhouse gas (GHG) emissions, especially methane, for the full life cycle of the dam. It is misleading the public to claim that hydroelectric is “non-emitting” in the LT2 RFP or in any other public arenas and could be considered fraudulent.