Comment 9: Installed capacity is not an adequate basis for hydropower eligibility.

Section no. (as in the document): Cover note, section 3.1 (applicability to scales of activity); and 4. Applicability

Paragraph / Table / Figure no.: Paragraph 8(b) (options B1.1, B1.2, B2); and paragraph 17

Comment (including justification for change): The proposed options assess hydropower applicability primarily using installed capacity thresholds, such as 15 MW or 50 MW. Installed capacity is not an adequate basis for deciding whether a hydropower activity should be eligible. Most hydro facilities reach their rated capacity only during the freshet, a high-flow period that typically lasts eight to ten weeks, and generate well below capacity for the rest of the year. A small run-of-river may generate only 15 to 30 percent of installed capacity (North of Dryden Integrated Regional Resource Plan, 2015, Ontario Power Authority and IESO). In fact, during the hottest days of the summer when air conditioners are humming, these run-of-river dams often have to shut down completely because there is not enough flow to turn the turbines. Consequently, a capacity figure says little about actual generation, operating mode, or emissions.

A capacity threshold also produces a perverse outcome. Small facilities greatly outnumber large ones: of the 224 waterpower facilities the Ontario Waterpower Association records in Ontario, 28 percent are under 1 MW and a further 38 percent are 1 to 10 MW, so 66 percent are 10 MW or smaller, the largest share of the fleet. Meeting a given generation target through many small dams, therefore, harms many more rivers than a single larger facility on a larger river, which has more water to moderate its impacts. ORA’s own experience bears this out: 34 proposed waterpower facilities, all under 10 MW, often in a cascading series of facilities to increase output, on 19 Ontario rivers represented roughly 115 MW of installed capacity but only about 57 MW of net output, since proponents themselves plan for about 50 percent net capacity. That is many fragmented rivers for very little actual power (Ontario Rivers Alliance, Hydro Impacts 101: The Trade-offs, page 32). That net output is also likely to decline further over the dam’s operating life, as climate change reduces and shifts river flows through drought, reduced snowpack and earlier runoff, so a capacity figure overstates both current and future generation (Canada’s Changing Climate Report, 2019). Eligibility should be based on storage, drawdown, operating mode, and measured emissions, not on installed capacity.