Excerpt from the Final Environmental Study Report:

In this alternative, the dam would be decommissioned through the removal of all available operational dam elements related to flow control including the stop logs and gains, as well as the low-level sluice gate bypass system. The decommissioning of the flow controls would be undertaken over an extended period of 2 to 3 years or more, to limit potential remobilization and offsite transport of accumulated sediments within the existing reservoir and to provide time for the sensitive flora and fauna of the area to acclimate to changing conditions.

Another defining feature of Alternative 5, as compared to the other dam decommissioning approaches, involves the retention of a barrier at/near the base of the existing stop logs, and the backfilling of the standing water area within the dam’s concrete spillway with stone to maintain a barrier to fish passage between upstream and downstream reaches. The objective of the barrier retention is to protect the highly sensitive native Brook Trout population within Young’s Creek upstream of the dam and reservoir against potential predation and/or out-competition from the more aggressive species known to frequent downstream reaches, if such were allowed to migrate above the dam.

The riparian floodplain area within the existing reservoir limits, beyond the newly formed watercourse, would be allowed to naturally return to a wetland habitat condition as the seed bank and nutrients stored in the sediment layers become exposed to the atmosphere and sunlight. The drying of the sediment, the creation of vegetated ground cover which serves to dissipate energy from incident precipitation, and the accumulation of a soil stabilizing root mass would all serve to add resistance to most erosive forces.

As described herein, it is expected that the implementation of Alternative 5 would represent a formal “decommissioning” of the dam, as defined in provincial guidance, and that the remaining earth berm and bridge structure would then be considered a “water crossing”. While regulatory confirmation of this decommissioning approach would need to be addressed as part of detailed design and permitting through Section 16 of the LRIA, preliminary discussions with MNRF staff (2024-02-14) provide confidence that such would be the case, and that the dam would cease to be considered as such upon implementation of the alternative.